HHT9400GFL hongtai dry bulk cement transport tanker semi trailer

Producenthongtai
Part Number

HHT9400GFL (HHT9400GFL)

Specifications

dry bulk cement transport tanker semi trailer

Unit Price11,41 EUR
Minimum Order Quantity1
Tariff No.
Lead Time
Weight and Dimension
DescriptionUse: Truck Trailer Type: Semi-Trailer Material: Steel Certification: CCC /ISO Size: 13000*2500*4000 OEM No.: we are original Max Payload: 26990KG Place of Origin: Hebei, China (Mainland) Brand Name: HONGTAI Model Number: HHT9400GFL produce name: cement tanker trailer Packaging & Delivery Packaging Details: nude,container,ro-ro,or as customer required Delivery Detail: 30days after down payment Specifications dry bulk cement transport tanker semi trailer 1.good quality,after-sale service 2.reasonable price 3.excellent reputation dry bulk cement transport tanker semi trailer SpecificationOverall dimension: 12980*2480*3850net volume:35m3Total weight:37560kgPay load:25000kgOutput:air pressure systemRate work pressure:0.2MPaMaterial:Q235B or Q345BShape:Bi-pyramid V shape structureChassis:Axle: 3 piece of 12 or 13 TON BPW, FUWA or YONGLITAIwheel base(mm):8000+1360+1360Front suspension:-/2230,-/1730Rear Track:1840/1840/1840Number of Leaf Springs(front/rear):-/10/10/10,-/8/8/8Landing gear:Jost double speed manual operation or otherKingpin:Jost 2" or 3.5"Suspension:FUWA mechanical tri-axle suspension with 16*90 8-leaf springsPneumatic braking system:a system with emergency brake and parking brake ;one unit of WABCO RE 6relay value;four unit of T30/30spring brake chamber;one unit of 40L air tank;two unit of standard copper air-connectorWheel rim:8.25R22.5 or other type on saleTyre:triangle ,Ling Long ,Double Coin or other equivalent brandAir Compact systemEngine:4100AG diesel Filtration and pressure control:included-at the outlet of the air compressorAir outlet system:2"main hole,2"check valve,1.5"safe valve,0.4Mpa gaugeGuard systemGuard on top of the tank:checkered plateSide guard:Cross bar-structureRear bottom guard:fixed typeDischarge systemDischarge:4" seamless steel tube at bottom of funnel and through the top of axleQuadratic blow:Same direction as discharge tube,1"diameter,with ball valve and check valveDischarge valve:4"disc valve fixed inside middle of rear guardPipeline cleaning equipment:at the beginning of discharge tubeTank cleaning equipment:11/2" rubber flexible hoseOther:Ladder:1 or 2 at front or rear or both ,bolted or weldedTool box:one box with selectable dimensions Lights and wire:one unit of 24V 7pin with lightsPainting:Sand blasting processing on rust cleaning One coat of anticorrosive Two coats of finish urethane paint Colour as customer required Spare part:Alloy manhole coverFlange for manhole rack unloading valve Oil and gas recovery jointBuilt-in respiration valveRespiration valveOil monitor
Datasheets
E-shop Coming Soon

E-shop Coming Soon
E-shop Coming Soon

E-shop Coming Soon
Related Parts
© 2015 WorldHNews.com